No named owner for exploitation after project end
Impact → Exploitation & IPR measures
Evaluators routinely drop Impact by a full point when no legal entity commits to carrying results forward. This can push Impact to the 3.0 threshold.
Name the entity, state the business model, and add a letter of intent as an annex. Add a foreground/background IP table.
- Owner
- WP7 lead — NordVolt
- Work package
- WP7
- Effort
- 3 d
- Raised by
- Impact & exploitation reviewer
“The consortium will ensure that results are taken up by relevant market actors.”
WP3 validation lacks a control baseline
Excellence → Soundness of methodology
Without a stated baseline, the 30% fault-recovery improvement is unfalsifiable and a reviewer will discount it entirely.
Define the baseline configuration, the measurement window, and the statistical test used for the comparison in T3.2.
- Owner
- WP3 lead — Aegean Institute
- Work package
- WP3
- Effort
- 5 d
- Raised by
- Sceptical scientist
“Fault recovery time will be improved by at least 30% compared to current practice.”
Impact chain skips the intermediate scale step
Impact → Credibility of pathways to impact
A jump from a 2-feeder pilot to EU-wide adoption reads as aspiration, not a pathway. Expect a credibility deduction.
Insert a replication step: number of DSOs, regulatory precondition, and who funds it after the project.
- Owner
- WP6 lead — Iberia DSO
- Work package
- WP6
- Effort
- 2 d
- Raised by
- Impact & exploitation reviewer
“Results will be adopted across European distribution networks.”
“Proposals are expected to demonstrate a credible route to replication beyond demonstration sites.”
Capability 'regulatory & tariff analysis' has no lead partner
Quality & efficiency of implementation → Capacity & role of participants
The topic text asks for regulatory analysis. An unowned capability invites the comment 'consortium not fully equipped'.
Assign the capability to an existing partner with evidenced track record, or add a linked third party.
- Owner
- Coordinator
- Work package
- WP6
- Effort
- 4 d
- Raised by
- Red-team auditor
“Activities should address regulatory and tariff barriers to flexibility services.”
Two partners duplicate grid-simulation role
Quality & efficiency of implementation → Capacity & role of participants
Reviewers question whether all partners are necessary; weakens 'no passengers' argument.
Split scope explicitly: transmission-level vs. distribution-level simulation.
- Owner
- Coordinator
- Work package
- WP4
- Effort
- 1 d
- Raised by
- Budget / project manager
“Both TU Rhein and Politecnico contribute grid simulation expertise to WP4.”
Open-science section names no repository or data steward
Excellence → Interdisciplinarity & open science
Boilerplate open-science text is a known evaluator irritant and an easy half-point loss.
Name the repository, licence, embargo policy, and the data steward role in WP1.
- Owner
- WP1 lead — Aegean Institute
- Work package
- WP1
- Effort
- 1 d
- Raised by
- Red-team auditor
“Data will be made open in line with FAIR principles wherever possible.”